GenPro Universal Heavy Duty Top-of-Pole Solar Racking Solution

IMPORTANT
• Mounting pole not supplied with rack

CAUTION
• It is the installers responsibility to follow all local, regional and national building codes.
• Always call 811 before digging to have all buried cable, water lines and gas lines marked.
• Do NOT install solar array near equipment or in places where flammable gases may be generated.

THE “RULE OF THUMB” GUIDLINES FOR MOUNTING POLE INSTALLATIONS
• It is the installers responsibility to verify all soil conditions.
• Soil conditions vary from region to region
• Soil conditions will determine the actual depth and diameter of the hole and concrete used.
• If you are uncertain we recommend you consut a civil engineer in your area who is farmiliar with local soil and wind conditions.